Design & Installation
We start at the meter or the well and work outward. Static pressure, flow rate, and available gallons per minute set the zone count, not a template. Head spacing is planned for head-to-head coverage so you do not get dry rings between arcs.
- Pressure and flow testing before any design work
- Zone map and head layout delivered in writing
- Vibratory plow install, valve boxes set level and accessible
- Controller programmed and walked through zone by zone